Gross Floor Area (expansion): 4,275 m2 (46,000 sq. ft.)
Goal: LEED® NC Silver
LEED EAp1 Commissioning including:
- Witnessing of selected mechanical and electrical tests
- BAS system verification
- Performance testing of HVAC systems
- Mechanical and electrical training coordination and video taping of sessions
- Seasonal performance testing of HVAC systems
Description
The Trico Centre project, formerly known as the Family Leisure Centre, saw the construction of a second ice rink for the facility, complete with new change rooms serving both the new and existing rinks. The project also included the construction of a new entrance space, a shell space for future tenants, and general renovations to the public spaces and pool-area change rooms.
High-efficiency boilers, a new ice plant, heat recovery air-handling units, roof top units serving the future space, and a dehumidification unit are all part of the new ventilation system that provides heating and cooling for the facility.