Gross Floor Area:  6,188m2 (66,607 sq. ft.)

Goal:  LEED® NC Silver

LEED EAp1 and EAc3 Commissioning including:

  • Pre-construction document reviews
  • Contractor submission reviews
  • Witnessing of selected mechanical and electrical tests
  • BAS system verification
  • Performance testing of HVAC systems
  • Mechanical and electrical training coordination and video taping of sessions
  • Seasonal performance testing of HVAC systems
  • Authoring of the re-commissioning manual

Description

The Yellowknife Field House project consisted of twin indoor soccer fields, a second floor running track, event spaces, meeting rooms, and supporting change rooms serving the entire facility.

Medium-efficiency boilers utilizing heat waste from the adjacent arena together with radiant slabs provide heating for the new facility. Heat-recovery ventilators and standard air-handling units comprise the ventilation system for the building.