Gross Floor Area (expansion):  8,268m2 (89,000 sq. ft.)

Goal:  LEED® NC Silver

LEED EAp1 and EAc3 Commissioning including:

  • Pre-construction document reviews
  • Contractor submission reviews
  • Witnessing of selected mechanical and electrical tests
  • BAS system verification
  • Performance testing of HVAC systems
  • Mechanical and electrical training coordination and video taping of sessions
  • Seasonal performance testing of HVAC systems
  • Authoring of the re-commissioning manual

Description

The South Fish Creek Arena expansion project consists of two new ice rinks complete with new change rooms that service both rinks. The project also included a new entrance space, administration area, community spaces, a shell space for future tenants, and a concession area.

On site hydronics included high-efficiency boilers and a new ice plant with snow melt and preheat options for domestic water use. The rinks were also fitted with new ventilation systems including heat recovery air-handling units, and a dehumidification unit.