Gross Floor Area:  3,597 m2 (38,717 sq. ft.)

Goal:  LEED® NC Silver

LEED EAp1 and EAc3 Commissioning including:

  • Pre-construction document reviews
  • Contractor submission reviews
  • Witnessing of selected mechanical and electrical tests
  • BAS system verification
  • Performance testing of HVAC systems
  • Mechanical and electrical training coordination and video taping of sessions
  • Seasonal performance testing of HVAC systems
  • Authoring of the re-commissioning manual

Description

The Bawlf replacement, grades-K-to-12 school features a mixture of permanent and modular classrooms, a new gymnasium, a library, meeting rooms, and an administration area.

High-efficiency boilers, demand-controlled ventilation, and heat recovery are a few of the numerous sustainable and energy-efficient tools incorporated into the new school.