Gross Floor Area:  1,982 m2 (21,334 sq. ft.)

Goal:  LEED® NC Silver

LEED EAp1 and EAc3 Commissioning including:

  • Pre-construction document reviews
  • Contractor submission reviews
  • Witnessing of selected mechanical and electrical tests
  • BAS system verification
  • Performance testing of HVAC systems
  • Mechanical and electrical training coordination and video taping of sessions
  • Seasonal performance testing of HVAC systems
  • Authoring of the re-commissioning manual

Description

The Mundare replacement school, grades K to 8, features a mixture of permanent and modular classrooms, a library, meeting rooms, and an administration area. The new facility also utilizes the existing school’s gymnasium, which features a separate entrance for after-hours access to the gym.

High-efficiency boilers, demand-controlled ventilation, and heat recovery are a few of the numerous sustainable and energy-efficient tools incorporated into the new school.