Gross Floor Area:  5,590 m2 (60,170 sq. ft.)

Construction Cost: Total  $34 Million

Goal:  LEED®  NC Silver

LEED EAp1 & EAc3 Commissioning including:

  • Pre-construction document reviews
  • Contractor submission reviews
  • Witnessing of selected mechanical and electrical tests
  • BAS system verification
  • Performance testing of HVAC systems
  • Mechanical and electrical training coordination and video taping of sessions
  • Seasonal performance testing of HVAC systems
  • Authoring of the re-commissioning manual

Description

The two-phase project includes the construction of a new 60-bed, long-term care facility that will replace the beds at the existing Dr. Cooke Extended Care facility The new facility will consist of three cottage wings, creating a greater feel of community in the centre.
High-efficiency boilers; and variable-speed, demand-controlled ventilation are two of the numerous sustainable and energy-efficient tools incorporated in the facility.

Additional Information:

Construction Manager:

Pentagon Structures, Tel: 780.436.1525