Gross Floor Area: 180,000 m2 (1,900,000 sq. ft.)
Construction Costs:
Total $370 Million (est.)
Mechanical $55 Million (est.)
Goal: LEED CS Gold
LEED EAp1 and EAc3 Commissioning including:
- Pre-construction document reviews
- Contractor submission reviews
- Witnessing of selected mechanical and electrical tests
- BAS system verification
- Performance testing of HVAC systems
- Mechanical and electrical training coordination and video taping of sessions
- Seasonal performance testing of HVAC systems
- Authoring of the re-commissioning manual
Description
Located in downtown Calgary, this complex consists of two towers, a retail podium, and a parkade. Phase one included the build of a 40-storey tower, full retail podium, 4.5 levels of below-grade parking, a loading dock, podium retail space with a food court, and a plus-fifteen bridge to Canterra Tower. The phase two tower will have a total of 23 tenant floors and be situated above the west portion of the Phase one parking area and podium.
Additional Information:Client:Oxford Properties Group Consultants:Architect: |
Electrical Consultant: Mulvey + Banani (Alberta) International Inc. Contractors:Construction Manager: PCL Construction Start & Completion Dates:Start: Spring 2007 |